Plants Individual Equipments Product Movies Product Stories Sales Catalog Download
  @@

Your Current LocationF Top PageProductsStoriesField ReportExperience of a plant installation

@
@
Return to Field Report

yOverseas Reportsz
 B2. Experience of a plant installation in Algeria @

K. D. (Overseas sales section),  Dec. 2008

In the year of 2008, a few plants and machineries, including one set of 400-ton crushing plant, three crawler-mounted crushers NC420GXC, three crawler-mounted crushers NC360GXC and two sets of screens and conveyers, were exported to Algeria. For the installation and the trial operation, we, four technical staffs from NAKAYAMA, went to Algeria.
The job was not easy at all. We met a lot of difficulties. For instance, the lack of driver and car for delivering machines and for commute from worksite to hotel. With the help from COJAAL (Consortium Japonais Pour'l Autoroute Algeriennej, we  rented a car and hired a local driver, then we could start out jobs at last. Although there were some unexpected things happened later on-- the car was stolen and the happening made the driver be in panic, etc., we eventually completed the job very well. By the way, the communication between us and local staffs was going well, though, our English skills were a bit poor, we could only use a smattering of English simple words and sentences.  
In spite of the difficulties,  there were lots of fun as well: the large-scale natural scenery, the delicious local foods, the interesting chats with the driver and the talks about his marriage, and so on.
The trip is over, but the days we experienced were very unforgettable. We hope the report will give you a whole picture about the trip, and will help you understand NAKAYAMA better. 

The author (right) & the driver

The installation field

The 4 staffs from Nakayama

Product Stories
R & D
Info. System
Equipment
Production
Sales
Delivery
Field Report
@
@
@
Return to page head